Documents and Forms : Consent Decree Reports

Email this page to a friend.
Adobe Reader is required to download documents from this site.
Search Documents and Forms:

Click on any column heading to sort the results
DateTitleDescription
123
Page size:
select
 54 items in 3 pages
5/14/2013Pump Station Overflow Elimination Plan 2013 Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on the implementation of the Pump Station Overflow Elimination Plan until all projects are complete. This is SD1's fifth Pump Station Overflow Elimination Plan Annual Report.
4/30/2013Quarterly Report No. 22Information contained within this report describes SD1's compliance with the Consent Decree for the period of January 1, 2013 through March 31, 2013.
1/30/2013Quarterly Report No. 21Information contained within this report describes SD1's compliance with the Consent Decree for the period of October 1, 2012 through December 31, 2012.
12/31/2012Capacity, Management, Operations and Maintenance (CMOM) FY 2012 Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on its implementation of their Capacity, Managagment, Operations and Maintenance (CMOM) programs. This is SD1's sixth CMOM Annual Report.
10/30/2012Quarterly Report No. 20Information contained within this report describes SD1's compliance with the Consent Decree for the period of July 1, 2012 through September 30, 2012.
7/2/2012Nine Minimum Controls 2012 Annual Compliance ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on its implementation of the nine minimum controls. This is SD1's fourth Nine Minimum Controls Annual Report.
12/22/2010Capacity, Management, Operations and Maintenance (CMOM) FY 2010 Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on its implementation of the CMOM programs. This is SD1's fourth CMOM Annual Report.
5/27/2010Capacity, Management, Operation and Maintenance (CMOM) Self-assessmentSD1's CMOM Self-assessment Report was approved by the United States E.P.A. and Kentucky's Environmental and Public Protection Cabinet on May 14, 2008. SD1's CMOM programs are designed to manage collection system assets and operations in a manner that maximizes efficiency and reduces the potential for overflow occurrences. Proper planning and management of CMOM programs can result in a reduction of the number, frequency, and volume of SSOs and CSOs.
5/27/2010Capacity, Management, Operation and Maintenance (CMOM) Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on its implementation of the CMOM programs. This is SD1's first CMOM Annual Report and contains an abbreviated summary of progress that has been made since submitting the first four CMOM components contained within the Consent Decree - the Grease Control Program, the Sewer Overflow Response Plan, the CMOM Self-assessment, and the Pump Station Operation Plan for Backup Power.
6/9/2010Capacity, Management, Operation and Maintenance (CMOM) FY 2009 Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on its implementation of the CMOM programs. This is SD1's third CMOM Annual Report.
12/21/2011Capacity, Management, Operation and Maintenance (CMOM) FY 2011 Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on its implementation of their Capacity, Managagment, Operations and Maintenance (CMOM) programs. This is SD1's fifth CMOM Annual Report.
6/9/2010Capacity, Management, Operation and Maintenance (CMOM) FY 2008 Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on its implementation of the CMOM programs. This is SD1's second CMOM Annual Report.
7/30/2012Quarterly Report No. 19Information contained within this report describes SD1's compliance with the Consent Decree for the period of April 1, 2012 through June 30, 2012.
6/15/2012Supplemental and State Environmental Projects Completion Report 
5/27/2010Consent DecreeA Consent Decree is a legally-binding document between SD1 and state and federal environmental regulators to improve water quality in Northern Kentucky. SD1's Consent Decree is the first of its kind in that it takes a holistic watershed management approach. Watershed management takes place by breaking the region down into smaller watersheds in order to strategically identify, evaluate, prioritize and correct the pollution factors unique to each area.
6/7/2012Initial Watershed Projects 2012 Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on the implementation of the initial watershed projects outlined in Exhibit D of the Consent Decree until all projects are complete. This is SD1's fifth Initial Watershed Projects Annual Report.
5/14/2012Pump Station Overflow Elimination Plan 2012 Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on the implementation of the Pump Station Overflow Elimination Plan until all projects are complete. This is SD1's fourth Pump Station Overflow Elimination Plan Annual Report.
4/30/2012Quarterly Report No. 18Information contained within this report describes SD1's compliance with the Consent Decree for the period of January 1, 2012 through March 31, 2012.
3/12/2008Nine Minimum Controls Documentation of Compliance ReportSD1's Nine Minimum Controls Documentation of Compliance Report was approved by the United States E.P.A. and Kentucky's Environmental and Public Protection Cabinet on July 6, 2008. This report provides a description of the status of SD1's compliance with the Nine Minimum Controls as set forth in the Combined Sewer Overflow Control Policy, as well as proposed projects for ensuring compliance is achieved no later than April 18, 2009.
1/30/2012Quarterly Report No. 17Information contained within this report describes SD1's compliance with the Consent Decree for the period of October 1, 2011 through December 31, 2011.
10/28/2011Quarterly Report No. 15 (Amended)Information contained within this report describes SD1's compliance with the Consent Decree for the period of April 1, 2011 through June 30, 2011.
10/28/2011Quarterly Report No. 16Information contained within this report describes SD1's compliance with the Consent Decree for the period of July 1, 2011 through September 30, 2011.
6/21/2011Nine Minimum Controls 2011 Annual Compliance ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on its implementation of the nine minimum controls. This is SD1's third Nine Minimum Controls Annual Report.
6/7/2011Initial Watershed Projects 2011 Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on the implementation of the initial watershed projects outlined in Exhibit D of the Consent Decree until all projects are complete. This is SD1's fourth Initial Watershed Projects Annual Report.
5/13/2011Pump Station Overflow Elimination Plan 2011 Annual ReportPursuant to the Consent Decree, SD1 is required to submit annual reports on the implementation of the Pump Station Overflow Elimination Plan until all projects are complete. This is SD1's third Pump Station Overflow Elimination Plan Annual Report.

54 items found