| 7/1/2012 | Clearing Permit Application | The Clearing Permit is required for clearing activities on a property. Clearing activities include stripping and cutting of trees and ground cover and the removal of roots and associated material. The Clearing Permit does not include any earth moving activities, including rough shaping of the site. A Clearing Permit will not be required if the property owner/applicant has received a Grading or Land Disturbance Permit for the property covering the same activity. |
| 11/16/2012 | Notice of Termination for Storm Water Permit - Application | This form should be completed by the approved permit holder who is requesting that he/she be relieved of their obligations under the following noted permit. The form must be completed in its entirety and delivered to: SD1 – Inspection Group, Attention: Andy Aman, 1045 Eaton Drive, Ft. Wright, KY 41017 or sent via email to aaman@sd1.org. The omission of required items may be cause for rejection of the request without review. |
| 6/1/2010 | Food Service Discharge Permit | |
| 12/17/2010 | FOG Questionnaire | |
| 10/4/2012 | Statement of Pumping Frequency | |
| 10/4/2012 | Statement of Grease Control Equipment Certification | |
| 2/6/2012 | Certified Tapper: Sewer Lateral Abandonment Application and Permit | Approval of this application and permit are required when disconnecting from SD1's system. Inspection is required. Call (859) 578-7460 before 4:00 pm to schedule an inspection. Twenty-four (24) hour notice is required for scheduling purposes. A cancellation or change must be made at least 2 hours before the scheduled inspection time.
|
| 8/28/2012 | Application for Sanitary Sewer Connection Permit | This application must be filled out in order to obtain a permit to connect to a sewer owned and maintained by SD1. Applicants must understand that all fees must be paid and that the fees represent the cost of additional demand on SD1's system. Only certified tappers are allowed to make a connection to SD1's sewer system. |
| 7/1/2012 | Grading Permit Application | The Grading Permit is required for grading activities on a property. Grading activities include excavation, filling, stockpiling, or other earth moving activities, and any combination thereof. The Grading Permit shall also include activities covered by a Clearing Permit. The Grading Permit may include the construction of sanitary sewers and other utility infrastructure (water, gas, electric, etc.); however, such installation shall occur at the risk of the property owner. Should a conflict with these utilities arise during the plan review of the storm water drainage system, the property owner will be required to resolve the conflict while adhering to the District's Storm Water Rules and Regulations. Such a conflict may result in a change in the sanitary sewers and other utilities and may require the installed utilities to be removed at no cost to the District. The installation of storm sewer systems (including storm sewer structures and pipes, detention ponds, etc.) require a Land Disturbance Permit and will not be approved as part of a Grading Permit. A Grading Permit will not be required if the property owner/applicant has received a Land Disturbance Permit for the property covering the same activity. |
| 7/1/2012 | Land Disturbance Permit Application | The Land Disturbance Permit is required for (1) any alteration of the earth's surface where natural or man-made ground cover is altered and for which the applicant has not received a Clearing or Grading Permit and/or (2) the installation of any storm sewer systems (including storm sewer structures and pipes, detention ponds, etc.). The Land Disturbance Permit shall also include activities covered by a Clearing, Grading, and/or Utility Permit if the applicant did not obtain a separate Clearing, Grading, and/or Utility Permit. |
| 8/1/2012 | Certified Tapper Application and Permit | |
| 7/9/2012 | Certified Tapper: Storm Sewer System Connection Application & Permit | |
| 8/20/2012 | Tapper Manual | This manual provides detailed information about SD1’s Certified Tapper Program, including current rules and regulations, lateral connection specification, information about the permitting process, staff contact information, and fee schedules. |
| 9/6/2012 | List of Certified Tappers | |
| 7/1/2012 | SD1 Fee Schedule | |
| 3/6/2012 | Food Service Establishment Grease Trap Waste Haulers Checklist | |
| 3/6/2012 | Grease Interceptor Checklist (greater than 1,000 gallons) | |
| 3/6/2012 | Grease Interceptor Checklist (up to 1,000 gallons) | |
| 1/31/2012 | Alternative Grease Control Equipment Design/Exemption Request Form | |
| 5/13/2010 | Transfer Request for Land Disturbing Activities Permit | This form must be completed by the approved permit holder and the person accepting the responsibilities and the obligations of the permit. It must be completed in its entirety and delivered to:
SD1 Storm Water Department
Attention: Bill Plunkett
1045 Eaton Drive
Ft. Wright, KY 41017
The omission of required items may be cause for rejection of the request without review. |
| 10/28/2010 | Request for Reservation of Sanitary Sewer Capacity | This form must be completed in order to reserve capacity for connections to the sanitary sewer system. For new developments, the Request for Reservation must be submitted prior to or with submittal of the improvement plans for sanitary sewer line extension. For those properties that have not been “placed in service”, as defined in Article 1 of the Sanitary Sewer Rules and Regulations, the Request for Reservation must be submitted prior to applying for a Sanitary Sewer Connection Permit. Reservation of Sanitary Sewer Capacity is subject to SD1 Board of Directors approval. The completed Request for Reservation must be submitted to:
Joe Verst, P.E.
SD1
1045 Eaton Dr.
Ft. Wright, KY 41017
|
| 4/6/2010 | Sanitary Drawing Submittal Application | This form should accompany all concept and development drawings. |
| 4/1/2010 | Application for Sewer Tapper Certification | |
| 4/1/2010 | Licensed Sewer Tapper's Bond | Companies interested in having their employees become certified tappers must first post a Licensed Sewer Tappers Bond of $5,750. This bond will be used to cover costs for correcting improper taps if not fixed within an appropriate time frame or to complete unfinished work. There is no limit to the number of employees that a company may have certified under this bond. |