SD1 Projects in Campbell County

Below is a list of projects that are currently in progress in Campbell County:

Ash Street Pump Station and Force Main Project
For a list of Frequently Asked Questions and responses about this proposed project, click here.

To download the fact sheet for this project, click here

Mary Ingles Highway Sewer Rehabilitation Project

Project Description: SD1 will be replacing two sections of wastewater sewer pipe that run along Mary Ingles Highway, between River Road and Tower Hill Road. Portions of the existing pipe have deteriorated and must be replaced. While crews are working, Mary Ingles Highway will be reduced to one lane. Traffic in both directions will be accommodated, but motorists should expect delays. All lanes of traffic will be open in the evenings, after crews complete their work for the day. 
Project Location: Highland Heights
Estimated Start Date: September 2017
Estimated Completion Date: November 2017
Project Manager: Rob Schroeder
Need more information? Email info@sd1.org or call 859-578-7450 and ask to speak to Rob Schroeder.


Riviera Drive Sewer Rehabilitation Project

Project Description: In 2016, SD1 replaced two sections of a wastewater sewer pipe that runs under Riviera Drive, between Route 8 and Sixth Street. SD1 will replace a third section of deteriorated pipe along Riviera Drive, near Bellevue Plaza, beginning in August 2017. This third phase of the project will take about six months to complete. A temporary road will be installed to ensure access to all businesses and two-way traffic throughout the project. 
Project Location: Bellevue
Estimated Start Date: Phase 3 - August 2017
Estimated Completion Date: Phase 3 - March 2018
Project Manager: Rob Schroeder
Need more information? Email info@sd1.org or call 859-578-7450 and ask to speak to Rob Schroeder.

Vernon Lane Sewer Rehabilitation Project
Project Description: As part of this multi-phase project, SD1 is installing new public sanitary and storm sewer pipes on Vernon Lane; south of St. Nicholas Place; along Chalfonte Court; on Linden Court; south of Linden Avenue; and south of Tremont Avenue, as shown in the project map

In addition to this work on the public sewers, some property owners must disconnect their private property storm drains (downspouts, driveway drains, sump pumps, etc.) from the sanitary sewer system. Private property owners who must perform disconnection work will be contacted on an individual basis about this issue.

Together, the public and private work will help eliminate overflows that occur in the neighborhood when it rains. These overflows spill raw sewage containing harmful bacteria and other pollutants into creeks and yards, threatening public health and the environment.
 
Public Construction Work (Current Phase)
Project Location:
Ft. Thomas
Estimated Start Date: October 2016
Estimated Completion Date: Summer 2017
Project Manager: Daniel Doss
Need more information? Email info@sd1.org or call 859-578-7450 and ask to speak to Daniel Doss.

Private Construction Work
Project Location:
Ft. Thomas
Estimated Start Date: January 2013
Estimated Completion Date: Ongoing
Project Manager: Rob Schroeder 
Need more information? Email info@sd1.org or call 859-578-7450 and ask to speak to Rob Schroeder.

Water's Edge Sewer Separation Project
Project Description: SD1 will be constructing a new storm water system under Taylor Avenue, between Eden Avenue and Walnut Street. This project will include digging in the road, which will require detours and may limit on-street parking on Taylor Avenue. Road closures will occur block by block, as crews work section by section to install new pipe.
Project Location: Bellevue
Estimated Start Date: January 2017
Estimated Completion Date: January 2018
Project Manager: Daniel Doss
Need more information? Email info@sd1.org or call 859-578-7450 and ask to speak to Daniel Doss.
  
Weather Water Quality Data Ohio River Employment Opportunities Legal Disclaimers Links Site Map
Copyright © 2010, Sanitation District No. 1 of Northern Kentucky | 1045 Eaton Drive, Fort Wright, Kentucky 41017 | 859-578-7450 | Map